
Application 01
Completions and hydraulic fracturing
Fracturing a well requires a large volume of water staged on location before the job begins. Operators use large-volume storage as a lower-cost alternative to fleets of smaller tanks, consolidating water into fewer vessels that are simpler to fill and draw from.
- Tanks in 25,000 and 40,000 bbl sizes
- Set in a published 4–6 hours ahead of the job
- Stainless steel fill and suction lines


